Quantcast
Channel: Questions in topic: "splunk-enterprise"
Viewing all articles
Browse latest Browse all 47296

Visualize event with start and stop time fields

$
0
0
Hello! We are trying to determine the best visualization to show scheduling data in Splunk. We have data that provides a Actual Start and Stop and Schedule Start and Stop in epoch time as fields as follows: 2019-09-12 20:52:56.000, MachNo="3", JobSeq="11823", MoldNo="9", PartNo="12202", ShiftSeq="201909130", DeptNo="8", JobID="F13264/3|MFCOV-10 ", JobDesc="F13264/3-PN1200/ 4- 6x 4-M-1400-CE ", MachID="Cal4 ", MachDesc="Calender 4 ", MoldID="CalC ", MoldDesc="CalC ", NumCavs="1.0", PartID="315274 ", PartDesc="CONV PN 1200/4 6x4 ", DeptName="Cal4 ", DeptDesc="Wide Bowl Calender ", StartTime="1568321576", StopTime="1568348425", StartTimeHR="2019-09-12 20:52:56.0", StopTimeHR="2019-09-13 04:20:25.0", SchedStart="1568563920", SchedStop="1568572920", SchedQty="2396.0", MiscInfo1="AS SCHED ", MiscInfo2="F13264/3-COV ", Status="3", StatusDesc="COMP", StatusDescription="Completed job. ", PctReg="0.0", PcsPerCtn="0.0", PartCost="0.0", MatlCost="0.0", ExpPctUp="100.0", ExpCycTm="2.933", ExpGood="100.0", HistPctUp="100.0", HistCycTm="2.933", HistGood="100.0", MinCycTm="2.0", MaxCycTm="60.702835", SumCycTm="21134.462338209152", SumSqCycTm="438594.73369550705", CycCnt="2200", CycOutSpec="2200", ExpProdQty="1312.8597412109375", CalProdQty="2200.0", PakProdQty="0.0", DefectQty="0.0", TotTime="26857", WtTotTime="26857.0", DownTime="6401", WtDownTime="6401.0", NumDownTm="12", WtNumDownTm="12.0", LaborTime="26857", WtLaborTime="26857.0", Counter2="0", Counter3="0", Counter4="0", MachCost="0.0", LaborCost="0.0", WtCycCnt="2200.0", GroupNo1="13", GroupNo2="255", GroupNo3="255", GroupNo4="255", PartGroupNo1="0", MoldGroupNo1="255", HelpMapId="1", DefectMapId="1", DownMapId="2", SetupCycCnt="0", WtSetupCycCnt="0.0", NonProductionCycCnt="0", WtNonProductionCycCnt="0.0", PartQualCycCnt="0", WtPartQualCycCnt="0.0", ProductionDecimalPlaces="1", ProductionUnits="Meters ", StockUnits="Rolls ", MiuMachSpeedUnit="4", TimeDivisor="60.0", IdleQty="0", IdleWtQty="0.0", PmQty="0", PmWtQty="0.0", LinearRateMultiplier="1.0", ScheduledCavs="1.0" Currently this is visualized in Excel, manually and looks like this: ![alt text][1] We are thinking to do line graphs which are plotted the start and stop vs the sched, but not sure how to plot these fields which have epoch time on a graph. By the same token think there might be other, better ways to visualize this? Hope answers can help!! Thanks guys, [1]: /storage/temp/274842-screen-shot-2019-10-03-at-102108-am.png

Viewing all articles
Browse latest Browse all 47296

Trending Articles



<script src="https://jsc.adskeeper.com/r/s/rssing.com.1596347.js" async> </script>